Wednesday, January 2, 2008

mass(ive)



My mason, Brian Knipfel, was camped out all weekend getting the masonry mass added to my heater core. The original idea was to then stucco the whole thing but it turned out so well that I'm going to hold off on the stucco. It's one day of work away from being ready to pop the pipe thru the roof. Then heat. I think the brick and block look great with the floor.

Sunday, December 9, 2007

glass



The doors and windows are mostly in and the piers are set for the steel girders supporting the second floor porch. I want to use all roughcut timber for the 8 x 16 foot raised front porch, the stair stringers and the board and batten siding. Some electric and plumbing planned this week so hopefully I can be running hot water into the floor to start heating it up by the weekend.

Wednesday, November 28, 2007

buttoning up



The house got closed in yesterday and the masonry heater core was installed today. The electrical service inspection was also today so now we wait for NYSEG to run us some wire and finally get some juice.

Monday, November 19, 2007

looks like a house




We finally got the heavy machinery (thanks Al) to get the upper walls on and the roof sheathing. Al and I worked thru the weekend to get it sealed up.(thanks again Al). And sure enough it's Monday and it's snowing. At least I don't have to shovel out the loft again! Now we put in the doors and windows, put ice and water shield on the roof, get the electricity hooked up, house wrap with tyvek, and get the masonry woodstove in, hopefully by the end of the year. Then we can work on the inside in relative comfort.

Sunday, November 11, 2007

Thursday, November 8, 2007

thursday november 8th


Here's the progress as of hunting time today.