The SIPs went up relatively easy with 3 of us. A 4X16 foot section weighs about 255lbs. The roof rafters are a little lighter but more involved (cutting,placement,etc.) Finally has the profile of a house/barn.
Thursday, November 8, 2007
walls up
The SIPs went up relatively easy with 3 of us. A 4X16 foot section weighs about 255lbs. The roof rafters are a little lighter but more involved (cutting,placement,etc.) Finally has the profile of a house/barn.
Friday, November 2, 2007
the walls are here
The SIPs came this morning. Unloading was relatively easy and took about an hour. Mike and Al should be ready to start work later today or next week. I think with the three of us it should go pretty fast. The heaviest panels are 255 lbs. We may need the crane to put up the second story panels... or lots of Wheaties!
Sunday, October 28, 2007
winter says hello
The yard's been finish graded and I have a gravel driveway down. The shed roof wall is sheathed and ready for the electric panel and meter to be installed. The ridge beam is up and ready to accept the rafters. We're down to the wire as it is going to go well below freezing tonight for the first time this fall.
Friday, October 19, 2007
the stick built wall
We decided to frame this wall traditionally so we can put up the roof joists and get moving with the roof. I've abandoned plans for a metal roof after seeing the great job that Mike and Al did with architrctural shingles on the main house. The rest of the walls will be SIP panels which will hopefully be here within 2 weeks.
Thursday, October 18, 2007
floored
Wednesday, October 10, 2007
erecting the beams
Tuesday, October 2, 2007
while we wait...